Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Home Additions & ADU in Pasadena, CA: What We Build and What It Costs
Home additions in Pasadena run $45,000 – $130,000, ADU construction runs $90,000 – $220,000, and garage conversions run $30,000 – $80,000. Those ranges aren’t guesswork. They reflect what it actually takes to build here, where a hillside lot in the foothills above the Arroyo or a Craftsman in Bungalow Heaven asks for two very different sets of plans, two different permit reviews, and a budget that holds up once soil gets tested. We’re Barrett & Sons Construction, and we pull the permits, put the scope in writing, and hand you a free estimate before any work starts. Call (888) 427-1810 to set one up.
Pasadena sits in a city that’s serious about saving its past and serious about fire safety at the same time. Add in county-level septic, well, and grading rules for the acreage properties along the foothill edges, and every project here needs a contractor who reads the rules before quoting a number. That’s the work.
Key Takeaways
- Home additions in Pasadena: $45,000 – $130,000. Detached ADUs: $90,000 – $220,000. Garage conversions: $30,000 – $80,000.
- Historic district review and Very High Fire Hazard Severity Zone rules can add 4 – 8 weeks to plan-check compared to neighboring unincorporated Altadena.
- On acreage in the Pasadena foothills, septic and well setbacks and slope-stability requirements often reshape the foundation plan before permits can be pulled.
- Every eligible job gets permits pulled and inspections signed. Every price change arrives as a written change order before the work moves.
Why Barrett & Sons Construction Is Pasadena’s Preferred Home Additions & ADU Company
We’ve been building and remodeling for homeowners since 1998, and our crews have up to 28 years of experience on additions, ADUs, and everything under them. That experience matters in Pasadena, where the plan-check process can turn on details that a national outfit won’t know to look for: whether your property is inside a historic district boundary, whether Chapter 14.24 fire-hardening rules apply at your elevation, whether the parcel is actually city-governed or county-governed on the back half.
Our Pasadena customers tell us the difference shows up in the small things: a live person answering the phone at any hour, a written estimate with line items rather than a number scribbled on a business card, and a foreman who calls before he changes a plan. We back every completed job with the 90-Day Done Right Promise, written on the contract, not buried in fine print. If something’s not right, one call brings us back.
We publish our license number and address because we want you to look them up. And with Pasadena only a short drive from our crews, we treat the whole city, from the 91103 foothill edges to the 91188 civic core, like a neighbor’s yard, not a service ticket.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Pasadena
Every project here starts with a walk of the lot and a conversation about what you actually want to use the space for. Then we scope the work in writing, with allowances and change orders laid out before a shovel hits dirt. Our Home Additions & ADU team handles the whole range of Pasadena projects, and these are the ones we do most.
ADU Design & Permitting in Pasadena
The design and permitting step is where a Pasadena ADU gains or loses months. In Bungalow Heaven and other historic districts, exterior changes visible from the street go through Cultural Heritage Commission review, and hillside properties face ignition-resistant construction standards under Chapter 14.24. We coordinate both, so your plan set arrives at the desk already on track instead of getting bounced back to you in study session.

New Detached ADU in Pasadena
A new detached ADU on a Pasadena lot is the dream for a lot of families, whether for aging parents, adult kids, or rental income. On a flat lot near the Arroyo’s lower edge, this moves quickly once the site is scoped. On a sloped foothill parcel, it moves at the pace of your septic leach field, well setback, and grading plan, and we work all three in parallel to keep the schedule honest.

Garage Conversion ADU in Pasadena
Pasadena’s 1900s to 1920s homes often have a detached garage or a deep one-car that begs to be converted. A garage conversion is the least expensive ADU route, typically $30,000 – $80,000, and it dodges most of the exterior review questions a new structure triggers. It still needs permits, electrical upgrades, and fire separation from the main house, and we handle those.

Junior ADU & Interior Conversion in Pasadena
A junior ADU lets you carve 500 square feet or less out of existing space, and that fits Pasadena’s mid-century ranch stock especially well. It’s the least disruptive path, no new foundation, no site work, but it still needs a permit and a plan that fits your home’s layout without awkward hallways or dark corners. We walk the floor plan with you first.
ADU Site Prep & Utilities in Pasadena
Site prep is where a foothill ADU can quietly go off the rails if it’s not scoped early. Percolation tests, boundary surveys, slope-stability setbacks, utility ties, grading, and drainage all feed the true cost. On a narrow, unpaved drive, long material hauls and equipment access change the draw schedule. We measure that up front so the quote reflects the real job.
Room Additions, Second Story Additions, and Sunrooms
Not every family wants a separate building, so we also build room additions, second-story additions, and enclosed sunrooms. A second-story addition on a Craftsman often needs foundation and framing review for structural adequacy, and we look at that before writing a scope. A sunroom or enclosed patio is a lighter lift, but still gets permits and proper detailing.
Trusted Brands We Service in Pasadena
For modular ADU shells and prefab components, we work with names you can look up: Abodu, Cover, Dvele, and Mighty Buildings all show up on Pasadena projects, and we coordinate with whichever suits your lot and your design intent. We don’t stock parts or hold inventory in a warehouse. When your build calls for a specific panel system or component, we source it and schedule around the lead time, because the alternative is a stalled job and a contractor who won’t answer the phone. You’ll know what’s arriving and when.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Pasadena Homes
We’ve walked enough Pasadena lots to know where the trouble usually lives. Most of it is foreseeable, and the reason we do a site walk and a percolation test before quoting is to catch it early rather than three weeks into a foundation pour.
- Assuming city rules apply to a county parcel. Pasadena’s foothill acreage has parcels under county jurisdiction, and applying city zoning to them means the plan-check comes back rejected and the schedule resets. We confirm jurisdiction before design starts.
- Septic and well setbacks discovered too late. When a proposed building pad lands too close to an existing leach field, the foundation and drainage plan both need redesign. We commission the percolation test and boundary survey up front so that doesn’t surprise anyone.
- Underestimated grading and drainage on sloped foothill lots. Pasadena’s Santa Ana-driven rainy seasons have a way of exposing slope-stability failures and forcing retaining wall work nobody budgeted for. We scope grading and drainage as a line item, not an afterthought.
- Unpermitted past work surfacing during the job. Pasadena’s 91101 and 91104 core is full of Craftsman and Spanish Colonial homes with original knob-and-tube wiring, clay sewer laterals, and additions that were never permitted. We call these out in the scope so the fix is planned, priced, and permitted, not a shock.
Pricing for Home Additions & ADU in Pasadena, CA
Pricing on Pasadena additions comes down to three things: the site, the review path your property is on, and the finish level you want. A flat lot with a clear permit path costs meaningfully less than a sloped foothill parcel that needs a percolation test, a boundary survey, a grading plan, and retaining wall design. Historic district review and Chapter 14.24 fire-hardening add design and plan-check time that has to be planned into the schedule and the price.
Here’s what jobs in Pasadena actually run:
| Project | Typical Pasadena Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
Every allowance is written into the scope before work starts. Every scope change gets a written change order before a nail moves, so you’re never handed a surprise invoice at the end. Estimates are free, and there’s no trip charge inside Los Angeles County. We also offer a free second opinion on any written estimate you’ve already received, which is worth a phone call if you’re weighing bids.
What pushes a Pasadena ADU project toward the top of the range
Sloped foothill lots with septic and well setbacks, historic district review on visible exterior elements, and fire-hardening under Chapter 14.24 all sit at the high end. Narrow, unpaved drives and long material hauls add to the draw schedule. On the lower end, a garage conversion or a junior ADU on a flat lot with a simple permit path comes in well below a detached new build. We lay that out in the estimate before you sign anything.
We Also Serve Cities Near Pasadena
Our crews also work in Altadena, La Cañada Flintridge, Glendale, and La Crescenta-Montrose. The permit picture shifts as you cross city lines, and unincorporated Altadena in particular follows county rules rather than city rules, which changes what a scope looks like. If you’re nearby and wondering whether we cover your street, give us a call and we’ll tell you straight. Our Pasadena project work is the heart of what we do in this area.
Serving Pasadena, CA – Our Local Coverage Area
We serve Pasadena and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Pasadena
It depends on your parcel, and the answer is settled by a title and zoning check, not a guess. Some acreage on the foothill edges is county-governed even though it carries a Pasadena-adjacent address, and applying city rules to it triggers a plan-check rejection that resets the schedule. We confirm jurisdiction before we design.
Setbacks to an existing leach field and well can push the building pad, shrink the usable footprint, or force a relocation of the lot. When a proposed pad lands too close, the foundation and drainage plan both need redesign. We commission the percolation test and boundary survey early so the design lands where it’s allowed the first time. Call (888) 427-1810 and we’ll walk the lot with you.
Yes, typically 4 – 8 weeks. Pasadena’s Cultural Heritage Commission reviews any exterior change visible from the street, and in Bungalow Heaven that can include a new window or door. That review runs on top of regular plan-check, so the design has to be scoped with it in mind.
Anything built in Pasadena’s Very High Fire Hazard Severity Zone has to meet Chapter 14.24 ignition-resistant construction standards, which affect roofing, siding, vents, windows, and decking. On the hillside parcels above the Arroyo and in the Lincoln-area foothills, that’s not optional, and it raises material cost. Plan for it in the budget from day one.
Grading and drainage are scoped as a line item, with a site survey and a slope-stability check before the foundation plan is finalized. Santa Ana wind events and the rainy season here expose slope failures and force retaining walls when drainage was underbuilt. We let allowances for unforeseen soil conditions be written on the contract so the number doesn’t shift the day work starts. Call (888) 427-1810 for a free estimate.
If you’re planning an addition or an ADU in Pasadena, the first step is a free, no-pressure estimate: a walk of your lot, a straight answer on what the permit path looks like, and a scope written out with line items and allowances. We pull every eligible permit, we sign every inspection, and every job is backed by the 90-Day Done Right Promise. Call (888) 427-1810 today to schedule your free estimate. A live person answers, day or night.
Written by the team at Barrett & Sons Construction.